|
When the well is ready for production, it is fitted
with a 'Christmas tree' which is a large metal structure with a
series of valves and fittings which controls the production rate
of oil and gas. There needs to be sufficient pressure within the
reservoir to drive the oil and gas to the surface, and fluid may
have to be pumped back down into the reservoir to stimulate the
flow. In many cases the water and gas that is extracted can be re-injected.
The oil, gas, and water have to be separated and installations are
equipped with an extensive range of plant to process these mixtures.
At the heart of the production process is the control room, where
a series of screens and monitors display the status of each well,
the separators, the power generation and gas compressors. These
are monitored to show the performance of each well and to calculate
the volume of oil and gas produced.
Production Engineer
The production engineer monitors the wells and recommends
measures to increase the efficiency of the production.
Production Operator
The production operator manages the flow of the oil
and gas from downhole through processing to sending it ashore.
Control Room Operator
The control room operator manages and monitors the
activities and reports to the OIM.
Current production engineering jobs
You are currently viewing page #
6 of
8.
Use the following links to navigate:
Previous
Home
Next
|